Sunday, September 02, 2007

Strange dream..

I had a very strange dream last night.. :/

I dreamt that Fredrik and I were in a hardware store (in Sweden) - which isn't surprising with all the stuff we've been buying lately.. And we kept trying to steal things.. :/ :)) And in the hardware store, there were baby clothes.. ?!?! We kept really bothering the sales person, and we stole the video surveillance tape.. And then we made our getaway in a mini-van.. :/

Very strange.. :/

I slept very well again last night! Seems like things are staying normal now. :)

Fredrik did LOTS of painting yesterday; we decided that I've been around enough paint.. The smell is just too strong with some of it. So I cleaned yesterday and he painted. :) He finished the second coat on the ceiling, and he did 2 coats on the bookshelf and the doorframe, and a coat around the window.

My job today will be to put the blue tape around everywhere in the room, to keep straight, clean green edging. :) And then if we find another face mask (the last one, the strap broke) then we will both start painting the room. It will take forever if I don't help, too.

Haven't really gotten anywhere with the computer. Trying to find the best way to get the larger files off the computer (Linux is being really picky with letting us move anything around on the harddrives)... and thinking about reinstalling windows on the other harddrive ... Fredrik really hasn't put a final decision on anything just yet.. :/

It's already September.. :/

Ooohh..!! I keep forgetting to mention ...

We had the 21 000 (3000$) estimate for the windows. And then the next day we received the estimate from the guy that came and looked, and that was 29 000 (4000$). Yesterday, the guy in Bengtsfors (21 000 est.) came over and looked at the windows. And he decided he didn't want the project..... :/ :)) Because the wall curves, he was afraid he wouldn't be able to do a good job - he didn't want to even try. So, he turned down the job! So, looks like we will be going with the other place. :)

But at least hopefully we can order everything, and then in about 7 weeks or something we can get started with installation.

No comments: